Built in 2019, replacing an unmaintained footpath in the same location. This is the second of the five blocks of Ridge Lane to be improved, the first being a walkway on the flat block between Margaret/Louisurg and Josiah/Howth.
This was made possible due to the work of the Ridge Lane Neighbors, who continue to works towards the improvement of the remaining blocks of Ridge Lane.