15 railroad tie steps up to a dirt footpath that runs through the block. The stairs were built in 2007 as part of a project to improve the streets and provide connectivity in the area southeast of Bernal Hill.
Gallery
July 2021
July 2021
July 2021
Path towards Ellsworth Street
•
July 2021
July 2021
Shortly after being built
•
October 2007
Intersection of Powhattan & Gates before the stairs were built
•
September 2005
A few steps along the path before the current stairway was built
•
September 2005