New steps were built at the top of the existing stairway in 2018 or 2019, when a garage was added to 1281-1283 Greenwich.
Gallery
May 2021
Top of the stairs blocked off with a piece of plywood during construction at 1281-1283 Greenwich
•
February 2018
May 2021
New steps in front of 1281-1283 Greenwich
•
May 2021
New steps in front of 1281-1283 Greenwich
•
May 2021
May 2021
During construction of the garage and driveway for 1281-1283 Greenwich
•
July 2021